A Man and His Blocks aka Legoland

July 17, 2013
The footings are in and its time to set up the logic blocks that will form the basement walls. 2 inches of styrofoam on each side, reinforced with rebar inside. The biggest game of lego’s you ever played. After setting up and squaring off everything, the walls go up quickly. Only one window in the basement so not too much cutting required.

Jul 17 2013_the man and his blocks

Hanna and Kensi inspect the work.

Hanna and Kensi inspect the work.

We rented bracing. Very nice to have the walk around scaffolding at the top.

Jul 24 2013_braced ready for wall pour

Advertisements

About Darlene & Ken

Experiencing life off the grid, building a home, and trying to live sustainably.
This entry was posted in Construction and tagged , , , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s